Utica Gas-fired Boiler Instruções de Operação

Consulte online ou descarregue Instruções de Operação para Aquecedores e fervedores de água Utica Gas-fired Boiler. Utica Gas-fired Boiler Operating instructions Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 48
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
P/N 240009432 Rev. A [03/2012]
UB 90 125-200 SERIES II
GAS-FIRED, DIRECT VENT,
CONDENSING, HOT WATER BOILER
INSTALLATION, OPERATION &
MAINTENANCE MANUAL
An ISO 9001-2008 Certified Company
Models
UB90-125
UB90-150
UB90-175
UB90-200
Manufactured by:
ECR International, Inc.
2201 Dwyer Avenue, Utica NY 13504-4729
web site: www.ecrinternational.com
Vista de página 0
1 2 3 4 5 6 ... 47 48

Resumo do Conteúdo

Página 1 - UB 90 125-200 SERIES II

P/N 240009432 Rev. A [03/2012]UB 90 125-200 SERIES IIGAS-FIRED, DIRECT VENT, CONDENSING, HOT WATER BOILERINSTALLATION, OPERATION & MAINTENANCE M

Página 2

10Condensate Drain RequirementsPitch condensate drain line down to fl oor drain at minimum of ¼” per foot (21mm/m). External condensate pump (not furni

Página 3

11If concentric vent termination is being used, refer to Figure 10 for proper setup.5 - COMBUSTION AIR/ VENT REQUIREMENTS - Roof Vent / Intake Termin

Página 4

123” Diameter PVCVent/Exhaust1½”4½” Dia.31⅞”AABBCCDEFGG3” Diameter PVCIntake/Combustion Air46¾”Dimension1³⁄ΟΤ”DEFDimensionVENTCOMBUSTION AIRCOMBUSTION

Página 5

13Connections And TerminationTo prevent damage to gas burner and ensure proper operation of unit, installer must clean and remove all shavings from in

Página 6

14InstallationRecommend all pipes be cut, prepared, and pre-1. assembled before permanently cementing any joint.Rigid supports cause excess noise in v

Página 7 - 3 - LOCATING THE BOILER

15 Check Gas SupplyGas pipe to boiler must be correct size for length of • run and total Btuh input of all gas utilization equipment connected to it.

Página 8

16WARNINGElectrical shock hazard. Turn OFF electrical power supply at service panel before making electrical connections. Failure to do so could re

Página 9 - 4 - NEAR BOILER PIPING

17AVOID THE FOLLOWINGDead Spots CornersAlcovesBehind doorsCold SpotsConcealed pipes or ductsStairwells - draftsUnheated rooms on the other side of the

Página 10

18NOTE: If any of the original wire as supplied with this appliance must be replaced, it must be replaced with type 150°C Thermoplastic wire or its eq

Página 11

19NOTE: If any of the original wire as supplied with this appliance must be replaced, it must be replaced with type 150°C Thermoplastic wire or its eq

Página 12 - WARNING

21 - Boiler Ratings & Capacities ...32 - Safe Installat

Página 13 - 6 ft. (1.8 m) in length

20See “Troubleshooting” on page 34 for detailed sequences of operation and troubleshooting procedures. See separately provided “Repair Parts Manual” f

Página 14

21Differential Pressure SwitchesDiaphragm type differential pressure switches are • connected by vinyl tubing to gas valve, air inlet connection on ne

Página 15

22Filling Boiler With Water And Purging Air For Systems With Conventional Closed Type Expansion TanksRefer to diagrams on “Near Boiler Piping” on page

Página 16

23 WARNINGIf you do not follow these instructions exactly, a fi re or explosion may result causing property damage, personal injury or loss of life.Thi

Página 17

2410 - STARTUPIf Burner Appears To Pulsate During Ignition:Turn off boiler power. Shut off gas supply to boiler.1. Take burner assembly apart by remov

Página 18 - 8 - ELECTRICAL WIRING

25DRAFT INDUCER TEMPERATURE SAFETY SWITCHDraft inducer runs through 30 second post purge and switches OFF.Circulator runs with thermostat on call for

Página 19

26 End Of Normal Sequence Of OperationThermostat ends call for heat.Gas valve and circulator pump are de-energized, valve and fl ame lights go out.Blow

Página 20 - 9 - CONTROLS AND ACCESSORIES

27 SERVICE HINTSPOWER ON STAND BYTHERMOSTATCALLS FOR HEATCIRCULATORENERGIZES THRU2K1 CONTACTSIBC SELFCHECK OF INTERNAL CIRCUITRY1-2 SECIBC CHECKS N.O.

Página 21

28 Sequence Of Operation DiagnosticsFollow sequence using the diagnostic indicator lamps on Integrated Boiler Control (IBC). See “Controls And Access

Página 22

29Inspect Venting & Air Intake System - Operate boiler. Verify all vent/air intake connections are gas-tight and water-tight. Repair any leaks im

Página 23

31 -BOILER RATINGS & CAPACITIES - SEA LEVEL RATINGS (NATURAL AND PROPANE GASES)Table 1 ModelInput (MBH)(1)Heating Capacity(MBH)(1)(2)Net AHRI R

Página 24

30Set Thermostat To Desired TemperatureSet thermostat to desired room temperature and observe several complete cycles to verify proper operation.Final

Página 25

3114 - TROUBLESHOOTING - HIGH LIMIT CONTROL AND LWCO LED Legend and LWCO Test Button1 HI TEMP illuminates when boiler water temperature reaches high l

Página 26

3215 - TROUBLESHOOTING -HIGH LIMIT CONTROL AND LWCO Troubleshooting Flow ChartBurner Will Not Fire See Flow Chart, this page.No or Insuffi cient Domest

Página 27 - SERVICE HINTS

33Initial Service ChecksBefore Troubleshooting:1. Verify circuit breaker is on or fuse is OK at electrical A. panel.Verify service switch is ON.B. Ver

Página 28 - SEQUENCE OF OPERATION

34 System StatusIndicator lights track operating sequence. If system locks out, lights indicate point in sequence of operation were lockout occurs. Re

Página 29 - Btuh Input Rate =

35

Página 30

36 Troubleshooting Chart 2  !"

Página 31

37 Troubleshooting Chart 3CHECK FOR VAC BETWEEN TERMINALS 1 AND 3 AT CONNECTOR CN4 ON IBCNO NOBLOWER STARTS REPLACE IBCCHART 1OPENPURGE LIGHT ON?NOYES

Página 32

38 Troubleshooting Chart 4IGNITER/SENSOR WARMSUP AND GLOWS YELLOW/ORANGEDURING 20 SECOND WARM UPCHART 3YESNOCHECK FOR 120 VAC BETWEEN TERMINALS 1 AND

Página 33

39! $$*)%&#% $$ ($%# $'' # #$$#$$'%&#'&ap

Página 34 - LIGHT STATUS INDICATES

41 - BOILER RATINGS & CAPACITIESThis is gas-fi red direct vent cast aluminum hot water boiler. Cast aluminum heat exchanger means better heat tran

Página 35

40 Troubleshooting Chart 6RUNS FOR 25-50 SECONDS, THEN TURNS OFF.CHECK FIRING RATE OF UNIT.IS UNIT FIRING AT THE CORRECT RATE?NODOES THE UNIT USE LP G

Página 36

41Differential air pressure switch is safety device which prevents boiler from fi ring if there is air intake, boiler heat exchanger or vent blockage.F

Página 37

42Acidic nature of fl ue gasses condensing on aluminum boiler sections cause formation of aluminum oxide. This oxide formation is normal, is generally

Página 38

43Annual Shut Down Procedure (End Of Each Heating Season)Follow the instructions in “WHAT TO DO IF YOU SMELL 1. GAS” on page 23.If heating system is t

Página 39

44 P/N# 240006888, Rev. E [06/2011]Aluminum SeriesHigh Effi ciency Gas-Fired BoilerDIELECTRIC ISOLATION & ANTIFREEZE PROTECTION ADDENDUMAPPENDIX A

Página 40

45System and Operating PrecautionsApplies to ALL Aluminum High Effi ciency Gas-Fired Water BoilersEliminate System LeaksContinuous addition of make-up

Página 41

46System and Operating PrecautionsApplies to ALL Aluminum High Effi ciency Gas-Fired Water BoilersGeneral Guidelines When Using AntifreezeUse only anti

Página 42

47Compatible Aluminum Antifreeze & Inhibitor SuppliersNoburst AL AntifreezeNoble CompanyP. O. Box 350Grand Haven, MI 49417www.noblecompany.comTel:

Página 43

ECR International 2201 Dwyer Avenue, Utica NY 13501web site: www.ecrinternational.com

Página 44 - Aluminum Series

5Boiler is equipped for residential installations. If used for commercial applications; additional code requirements must be adhered to. This may requ

Página 45

6Locating The BoilerSelect level location, central to piping systems served 1. and close to vent and air intake terminals as possible.Accessibility cl

Página 46

7After it has been determined each appliance remaining 6. connected to common venting system properly vents when tested as outlined above, return door

Página 47

8Do not install copper supply and return piping directly 1. into aluminum boiler section castings due to galvanic corrosion between dissimilar metals.

Página 48 - ECR International

9Safety Relief Valve / Temperature Pressure GaugeBoiler is furnished with safety relief valve and temperature pressure gauge.Install safety relief val

Comentários a estes Manuais

Sem comentários